high frequency transformer
Having legal effect
International credibility
Declaration on the same day
Real time progress tracking
1v1 full jury
5-star service experience
UL5085 certification is a standard for specific equipment that needs to be able to work safely and effectively under specific conditions. Therefore, UL5085 certification is essential to ensure the safety of industrial equipment. The specific requirements of UL5085 certification include the requirements of equipment structure, materials, performance, electrical design, safety protection, etc.
For high-frequency transformers, UL5085 certification testing and evaluation:
1. Structure and design: The structure of the transformer must be reasonable and able to withstand the stress and temperature under normal operation and abnormal conditions. The design must comply with the relevant electrical safety codes.
2. Electrical performance: including voltage, current, power factor and other electrical parameters must be within the specified range, and must be stable and reliable.
Insulation performance: The insulation material of the transformer must meet the UL standard and be able to withstand the test of high voltage and high temperature to ensure that no safety accidents such as electric shock and short circuit occur.
4. Protection measures: The transformer must be equipped with complete protection measures, such as overload protection, short circuit protection, temperature protection, etc., to ensure that the power supply can be cut off in time under abnormal conditions to prevent the accident from expanding.
When high-frequency transformers are UL5085 certified, the following steps usually need to be followed:
1. Prepare documents: enterprises need to prepare relevant product safety data, production process control manuals and product specifications.
2. Testing products: Enterprises need to send products to the Ancorset testing certification laboratory for testing. The test content generally includes mechanical, electrical, environmental and personal safety performance.
3. Evaluation documents: The Accorset Testing and Certification Laboratory will evaluate the documents prepared by the manufacturer, including product specifications, control manuals, test reports, etc.
4. Review the manufacturer: Ancoret arranged UL engineers to review the manufacturer, including production management system, quality control system, etc.