UL 2011 Certification Standards


1. The UL2011 standard covers production equipment for attended or unattended assembly of products or sub-components. The production equipment covered by this standard is designed to be programmed for specific manufacturing applications, such as assembly, packaging, sorting, part counting or punching or cutting of components. UL 2011 is based on NFPA 79, Industrial Mechanical Electrical Standard.

2. The UL2011 standard covers industrial machinery operating at 1000 volts or lower under a zoned system and intended for use in ordinary (unclassified) locations and hazardous (classified) locations. Unless otherwise specified, this equipment should be installed in accordance with the National Electrical Code (NEC),ANSI/NFPA 70, unless the maximum ambient temperature does not exceed 40°C (104 °F).

3. The UL2011 standard also covers the following types of machines that meet the electrical and mechanical standard NFPA 79: machine tools, plastic machinery, wood machinery, assembly machines, material handling machines, inspection/testing machines, packaging machines, factory automation equipment, pick-and-place machines, industrial additive manufacturing machines and car washing systems;

Automated production line UL2011 certification test project


1. Temperature the Test temperature test;

2. Dielectric Voltage-Witnstand Test withstand voltage test;

3. Single Phasing Test single phase test;

4. Fan Locked Rotor Test;

5. Blocked Filter Test clogging filter test;

6. Drive Motor Locked Rotor Test Drive Motor Stall Test;

7. Emergency Stop Operation Test Emergency stop operation test;

8. Breakdown of Components Test component failure test.

Automatic production line UL2011 certification main requirements


structural requirements:

1. The capacity design of equipment and electrical switch wires shall meet the requirements of UL508A.

2. The protection device of the equipment includes the design of emergency protection and the other grounding design.

3. All electrical components must be UL certified parts.

Performance requirements:

the performance requirements are mainly insulation, withstand voltage and operation tests, etc., which require UL engineers to conduct field tests.

If it is necessary to determine the structure and design changes and replacement of parts in detail, it is necessary to provide equipment design drawings.

Automatic production line UL2011 certification to provide information


1. Product description (product information and use);

2. Parts and raw materials (Bill of Material: BOM): including part name, manufacturer's full name, model, UL file number, etc;

3. Engineering drawings/dimensional drawings/circuit diagrams;

4. Product manual;

5. Electrical (grade) specifications (including voltage, current, etc.);

6. Use environment, purpose and operating conditions.