home / News Center/Industry dynamics

Injection molding machine-industrial automation equipment UL2011 certification how to do

SRF 2024-10-12 17:03

UL2011 certification is a comprehensive test and evaluation based on a number of standards, including mechanical and electrical safety performance, stability testing, short circuit and overload protection testing, environmental adaptability testing, etc. Injection molding machines certified by UL2011 must meet these test requirements and maintain stable and reliable performance during production and use.

UL2011 certification for injection molding machine manufacturers and users are of great significance. While ensuring product quality, manufacturers have improved the safety performance of products, met the needs of consumers, and increased market competitiveness; users can rest assured to choose injection molding machines certified by UL2011, reducing safety risks and ensuring personal and Property safety.

Injection Molding Machine-Industrial Automation Equipment UL2011 Certification the following information needs to be prepared:

1. Injection Molding Machine- industrial automation equipment UL2011 certification application Form:

provide detailed and accurate name, address, contact person, postal code, telephone and fax of the following units in Chinese and English.

(a) Applicant company: the company that applies for product testing and is responsible for all engineering service costs.

(B) listed Company: the names of the companies listed in the various product catalogs published by UL Corporation

(c) Production plants: manufacturers and producers of products.

2. Apply for injection molding machine- industrial automation equipment UL2011 certification product Information:

product information shall be provided in English.

(a) Name of the product: the full name of the product provided.

(B) Product model: list in detail all the product models, varieties or classification numbers that need to be tested. Wait.

(c) The intended use of the product: e.g. homes, offices, factories, coal mines, ships, etc.

(d) Parts list: list the parts and models (classification numbers), ratings, and names of manufacturers that make up the product in detail. When the part has been UL certified or approved, please prove the specific model of the part, and indicate its UL file number

(e) Electrical properties: for electrical and electronic products. Provide electrical schematic diagram (wiring diagram), electrical performance table.

(f) Structure diagram: for most products, the structure diagram or explosion diagram of the product, ingredient list, etc. shall be provided.

(g) Photographs, instructions for use, items such as safety or installation instructions of the product.

Above is introduction of UL Certification by Ankejie Testing and Certification, for reference only, some of the material comes from the Internet and does not represent the point of view of Ancor's detection technology and is responsible for its authenticity. If you are involved in the content of the work, copyright and other issues, please contact us within 30 days, we will delete the content in the first time!